Western Hospital Sunshine, Majorca Street

Client:
Western Health

Project Status:
Complete

SALT was engaged in 2017 by Western Health to provide a high-level review and feasibility study regarding the traffic and waste engineering impacts of the Sunshine Hospital loading bay reconfiguration project. SALT was able to provide a one stop shop for our client with our teams of engineers working collaboratively to provide a complete solution.
SALT was successfully able to review and develop a series of feasibility designs that

  • Allowed for the safe and efficient disposal of clinical and common waste;
  • Met clients’ goals and design preferences; and
  • Facilitated easy access for waste disposal vehicles and circulation within the area.

We enjoy working collaboratively and in multidisciplinary teams and believe that by offering our full suite of services (traffic engineering and design and waste engineering and ESD) we are able to produce the most efficient, streamlined and cost-effective services for our clients.