Southgate Redevelopment
Client:
ARA Australia
Project Status:
Complete
SALT was engaged in 2018 by ARA Australia to provide ongoing traffic consultation services for the major upgrade of the Southgate precinct. This included the construction of a new office tower, significant changes to the public realm and new food/retail tenancies.
SALTs involvement has included:
- Parking and loading design (including truck lifts);
- Pedestrian and bicycle movement enhancements (including shared zones); and
- Precinct integration with all modes of travel including to and from St Kilda Road and City Road.
Additionally, SALT prepared a detailed pedestrian and cyclist movement study which included undertaking numerous surveys at key locations within the vicinity of Southgate. The aim of this study was to understand key pedestrian and cyclist routes within the precinct to best serve the needs of all road users.