GOVERNMENT SERVICES

The staff at SALT have worked on numerous public realm and government projects, focusing on finding opportunities to improve existing, and aid in the development of, new infrastructure with the aim of creating safer, more user-friendly experiences.
We collaborate with clients, architects and governmental bodies to ensure that the designs provided are commensurate with relevant Australian Standards and AustRoads guidelines and are functional, safe and attractive to users. This includes providing for pedestrians, DDA access, cyclists, motorists and public transport connections.

BRIEF SUMMARY OF SERVICES:

Our services in this area include:

TRAFFIC
WASTE AND ESD
  •  Pedestrian facilities, linkages and safety;
  •  Bicycle provisions and shared paths;
  •  Disabled access and parking;
  •  Traffic and pedestrian operated signals;
  •  Loading/waste/emergency vehicle circulation and management;
  •  Signage and line marking plans;
  •  Public transport integration.
  •  Local government waste strategies
  •  Waste management guidelines
  •  Transport and collections options assessments
  •  Waste policy advice
  •  Tender assessment
  •  Waste audits and data analysis
  •  Waste infrastructure design and approvals
  •  Kerbside collections trials (FOGO and glass)
  •  Business case development
  •  Cost benefit analysis
  •  Project management services
  •  Community engagement
  •  Waste education and behaviour change
  •  Stakeholder engagement
  •  Waste management plans
  •  Environmental management plans
  •  Environmental monitoring and reporting
  •  Environmental risk assessment
  •  Regulatory compliance advice
PROJECTS:

The traffic engineering and design, and waste and environment team at SALT have been involved in lead roles in the following projects:

GOVERNMENT SpringvaleBoulevardPedestrianConnectivity SourcedImage Image

Springvale Boulevard Pedestrian Connectivity and Safety Upgrades

SALT was engaged by the City of Greater Dandenong in late 2016 to provide ongoing traffic…

GOVERNMENT ReviewofTransferStationsandResourceRecoveryInfrastructureforSustainabilityVictoria StockImage Image

Review of Transfer Stations and Resource Recovery Infrastructure for Sustainability Victoria

SALTs waste leader led the review of waste transfer stations and resource recovery infrastructure…

GOVERNMENT PaisleyStreetscapeUpgrade ProjectImage Image

Paisley Street Streetscape Upgrade, Footscray

SALT was engaged in 2019 by the City of Maribyrnong to provide traffic consultancy for the…

Melton City Council Waste – Caroline Spring Waste Audit and Waste Management Plan (WMP)

SALT was engaged by Melton City Council to conduct a waste audit and waste management plan at the…

Frankston City Council Waste Management Guidelines

SALT was engaged in 2016 to develop the Frankston City Council Waste Management Guidelines. Using…

Swan Hill Rural City Council Kerbside Collection Tender

SALT’s waste engineering team was engaged in 2021 to prepare the tender documentation for a new…

Swan Hill Mattress Processing Facility Feasibility Study

SALT was engaged by Swan Hill Rural City Council in 2021 to prepare a feasibility study for a…

fp 7

State Library Victoria

Vision 2020 is an $88.1 million redevelopment project transforming State Library Victoria. Designed…

Paynesville hero v2

Paynesville Growth Area

In 2015 SALT prepared a precinct structure plan for Paynesville, Victoria. This plan includes…

Northern Grampians Shire Council Kerbside Waste Audit

SALT’s waste and environment team completed a kerbside waste and recycling audit for Northern…

Metung hero 4

Metung Town Centre

We were engaged to improve parking access and improve pedestrian circulation in the Metung town…

fp 2

Metro Rail

The Melbourne Metro Rail Authority on behalf of the Victorian Government is undertaking the design…

Macedon Ranges Hard Waste Collection Feasibility Study

SALT’s waste engineering team was engaged in 2021 to prepare a feasibility study on potential hard…

Macedon Ranges EPA Registrations and Risk Assessment

SALT assisted Macedon Ranges Shire Council in registering their waste transfer stations with EPA…

Hampshire road v1

Hampshire Road Overpass

In 2016 SALT was engaged by Brimbank City Council to conduct a study of proposed bicycle and…

Glen Waverley v2

Glen Waverley Activity Centre

Analysing traffic impacts In December 2013, SALT was engaged to decrease the environmental impacts…

Frankston v4

Frankston Car Parking Study

In 2016 SALT conducted a car parking design study in the Frankston Metropolitan Activity Centre…

Central Goldfields Transfer Station Design and Funding

SALT was engaged in 2021 to prepare concept designs and documentation to support Central Goldfields…

Bathurst Landfill Rehabilitation Assessment

SALT was engaged in 2021 to prepare a cost estimate for rehabilitation of the Bathurst landfill for…

BWEZ hero 1

Ballarat West Employment Zone

Jo Garretty was the initial traffic engineering project  manager engaged by Major Projects in 2013…

GOVERNMENT BairnsdaleCBD ProjectPhoto Image scaled

Bairnsdale CBD

In 2014 we were engaged to increase parking availability and improve traffic circulation of…

Other projects

• Little Mallop Street Streetscape Project, Geelong
• State Library, Melbourne
• Barkly Square Shopping Centre Car Park Pedestrian Safety Improvements
• Mount Street Precinct Open Space Network Prahran
• Warburton Local Movement and Transport Study
• RMIT University Pedestrian Safety Assessments
• Melton City Council Waste Management Guidelines
• Melton City Council Waste Generation Calculator